Total Machining Time Formula:
Definition: Total machining time is the sum of all the time spent performing various machining operations on a workpiece.
Purpose: This calculator helps determine the total time required to machine a batch of components, considering production costs, tool costs, and setup times.
The calculator uses the formula:
Where:
Details: Accurate machining time estimation helps in production planning, cost estimation, and resource allocation for manufacturing processes.
Tips: Enter all required values with appropriate units. The ±5% indicates the typical tolerance range for these parameters in manufacturing environments.
Q1: What factors affect total machining time?
A: Key factors include batch size, tool change frequency, setup time, and the complexity of machining operations.
Q2: How does tool cost impact machining time?
A: Higher tool costs typically correlate with better tool life and performance, potentially reducing total machining time.
Q3: What's a typical setup time for machining?
A: Setup time varies widely (from minutes to hours) depending on part complexity and fixturing requirements.
Q4: How can I reduce total machining time?
A: Strategies include optimizing tool paths, using better tooling, reducing setup times, and implementing efficient tool change procedures.
Q5: Does this calculation include non-cutting time?
A: Yes, it accounts for setup and tool change times which are part of the total production time.