Formula Used:
| From: | To: |
This calculator determines the probability that wave height is lesser than or equal to the design wave height using the formula: p = 1 - (m/N), where m is the number of waves higher than the design wave height and N is the total wave number.
The calculator uses the probability formula:
Where:
Explanation: The formula calculates the complement probability of waves exceeding the design height, giving the likelihood that waves will be at or below the design threshold.
Details: This probability calculation is crucial for coastal engineering, offshore structure design, and maritime operations to assess the likelihood of wave conditions staying within safe design parameters.
Tips: Enter the number of waves higher than design wave height (m) and the total wave number (N). Ensure m ≤ N and both values are non-negative integers.
Q1: What does a probability of 0.8 mean?
A: A probability of 0.8 means there's an 80% chance that wave heights will be at or below the design wave height.
Q2: How is wave number measured?
A: Wave number represents the total count of waves observed or considered in the analysis period.
Q3: What is considered a good probability value?
A: Higher probability values (closer to 1) indicate greater safety margins. Specific acceptable values depend on the engineering application and risk tolerance.
Q4: Can this be used for extreme wave analysis?
A: This simple probability model works best for general assessments. Extreme value analysis requires more sophisticated statistical methods.
Q5: How does sample size affect accuracy?
A: Larger wave numbers (N) provide more statistically reliable probability estimates, especially when dealing with rare extreme events.